关注

微信公众号

顶部
淖毛湖风电场

淖毛湖风电场位于新疆哈密淖毛湖镇,总装机10万千瓦。每年可节约标煤5.817万吨,减少二氧化碳排放约18.178万吨。 Naomaohu wind farm is located at Naomaohu,Hami city,Xinjiang, with 100 MW installed capacity. It decreases 58.17 thousand tons of Coal combustion and about 181.78 thousand tons CO₂ emission every year.

乌吉尔风电场

乌吉尔风电场位于内蒙古鄂尔多斯市杭锦旗,总装机5万千瓦。每年可节约标煤3.484万吨,减少二氧化碳排放约10.888万吨。 Wujier wind farm is located at Hangjin Banner, Erdos City, Inner Mongolia, with 50 MW installed capacity. It decreases 34.84 thousand tons of Coal combustion and about 108.88 thousand tons CO₂ emission every year.

百灵庙风电场

百灵庙风电场位于内蒙古自治区达茂旗,总装机10万千瓦。每年可节约标煤8.293万吨,减少二氧化碳排放约25.917万吨。 Bailingmiao wind farm is located at Bailingmiao Town, Damao Banner, Baotou City, Inner Mongolia, with 100 MW installed capacity. It decreases 82.93 thousand tons of Coal combustion and about 259.17 thousand tons CO₂ emission every year.

海力素风电场

海力素风电场位于内蒙古自治区巴彦淖尔市乌拉特后旗,总装机10万千瓦。每年可节约标煤6.985万吨,减少二氧化碳排放约21.827万吨。 Hailisu wind farm is located at Urad Rear Banner, Bayannur City, Inner Mongolia, with 100 MW installed capacity. It decreases 69.85 thousand tons of Coal combustion and about 218.27 thousand tons CO₂ emission every year.